December 3: Quebec Bridge Opens

2016-12-03

Raising center span. Photo from “Popular Mechanics,”December 1917

On 3 December 1919, after nearly 30 years of planning and constructing, the Quebec Bridge opened to traffic. The project had failed twice before costing 89 individuals their lives.

The bridge is a riveted steel structure about 1000 meters long, 30 meters wide, and 105 meters high. The bridge has three lanes, one rail lane, and a pedestrian walkway along with at one time carrying a streetcar line. Plans for the bridge were included in the National Transcontinental Railway project undertaken by the federal government in 1887.

So appropriately he can relate to that, and then I began to think that we could apply this to fishing, sometimes it is brutal, it is hot, you female viagra pill haven’t had a bite in three hours, but then all at once, you can see the color coming off the bottom and take your fly. This medicine is made of sildenafil citrate, energyhealingforeveryone.com purchase viagra in australia which works effectively to provide an erection. After completion of look these up generic cialis physical therapy, the physiatrist doctor designed. Also if the person wants to consume it with some other food items then they need to make it pfizer viagra samples point to take proper assistance from the doctor. The first design of the bridge did not have success due to early preliminary calculations that were never properly checked leading to a weight which was far in excess of its carrying capacity. A second attempt to build the bridge began in 1916. On 11 September 1916, while being raised into position, the central span fell into the river killing 13 workers. The central span still lies in the river at the bottom.

The bridge was declared a historic monument in 1987 by the Canadian and American Society of Civil Engineers. Additionally, it was declared a National Historic Site of Canada on January 24, 1996.

–Robert Updyke

Leave a Reply